In order to repave a trench for a new water line, on Thursday October 5th at 7 pm, crews will close Main St between 400 W and 300 W. This closure will remain in effect through the night, as crews should be finished with the paving and closure by 5 am on Friday October 6th. In conjunction with the brief closure of Main St, 400 W will be reopened to 2-way traffic, with access also restored from 200 N. Detour signage will be in place, but traffic can utilize 400 W or Fairfield to bypass the closure. Please be advised of construction conditions on 400 W, and be careful of uneven terrain and personnel continuing to work in the area, as they begin prepping 400 W for repaving.